|
TOPOGRAPHIC WORKS EXECUTED FOR LIFTING AND DRAWING A COLLECTIVE CONSTRUCTION GF+1F+A IN A RESIDENTIAL AREA OF TIMISOARA, ROMANIA
|
|
|
C. Barliba; Luminita Livia Barliba; C.A. Popescu; Ionel Samfira; F. C. Barliba
|
|
|
10.5593/sgem2022/2.1/s09.31
|
|
|
10.5593/sgem2022/2.1
|
|
|
1314-2704
|
|
|
978-619-7603-40-8
|
|
|
English
|
|
|
22
|
|
|
2.1
|
|
|
• Prof. DSc. Oleksandr Trofymchuk, UKRAINE
• Prof. Dr. hab. oec. Baiba Rivza, LATVIA |
|
|
Geodesy and Mine Surveying
|
|
|
The theme of the work aimed to present a model of drawing up and carrying out a drawing work for collective constructions in order to build a building with a ground floor + 1st floor + attic. This project has been approved by the City Hall of Timisoara, Romania.
The purpose of the work was to identify and execute a topographic elevation, to draw and track the horizontality and verticality of the building for each level (ground floor, floor, attic). The work was completed with the preparation of a cadastral documentation that includes the tabulation of the construction and the division into apartments of the building, being a collective dwelling with several beneficiaries. It was designed to be a construction type with a height regime GF+1F+A included in the land book 441649 from the database of the municipality of Timisoara. The building will have 4 housing units per level: ground floor, 1st floor and attic, each with 4 apartments. The structure of the building is made of 25 cm brick, with an exterior insulation of 10 cm, and the roof will be made on a wooden structure covered with metal tile. Due to the small tolerances admitted by the builder in drawing the axes and bolts, it was absolutely necessary to perform specialized works to identify the land, to execute the topographic elevations in order to draw up the situation plan and, subsequently, to place the future construction according to the distances approved by the urbanism certificate and building permit. This type of works requires a large volume of work both in the preliminary phase and in the execution phase: measuring large areas of land and raising all the details of planimetry and relief. |
|
|
collective construction, tracing plan, total station
|
|
|
||
|
conference
|
|
|
||
|
||
|
Proceedings of 22nd International Multidisciplinary Scientific GeoConference SGEM 2022
|
|
|
22nd International Multidisciplinary Scientific GeoConference SGEM 2022, 04 - 10 July, 2022
|
|
|
Proceedings Paper
|
|
|
STEF92 Technology
|
|
|
International Multidisciplinary Scientific GeoConference SGEM
|
|
|
SWS Scholarly Society; Acad Sci Czech Republ; Latvian Acad Sci; Polish Acad Sci; Serbian Acad Sci and Arts; Natl Acad Sci Ukraine; Natl Acad Sci Armenia; Sci Council Japan; European Acad Sci, Arts and Letters; Acad Fine Arts Zagreb Croatia; Croatian Acad Sci and Arts; Acad Sci Moldova; Montenegrin Acad Sci and Arts; Georgian Acad Sci; Acad Fine Arts and Design Bratislava; Turkish Acad Sci.
|
|
|
265-272
|
|
|
04 - 10 July, 2022
|
|
|
website
|
|
|
|
|
|
8499
|
|