Scholarly record
INCREASING THE CAPACITY AND RELIABILITY OF THE PRIMARY CRUSHING SYSTEM OF ORE AT THE OPEN PIT VELIKI KRIVELJ , SERBIA
Publication Impact Profile
Publication details
References10
Mines engineering, Serbia Analysis of realized annual capacities of excavation and influencing factors at the open pit Veliki Krivelj operating within RTB Bor – Group, Serbia Žikić, 145 2011
Additional mining project of extraction and processing of the copper ore in the Veliki Krivelj ore deposit for the productivity of 10.6 M tons of wet ore per year (in Serbian: Dopunski rudarski projekat otkopavanja i prerade rude bakra u ležištu Veliki Krivelj za kapacitet 10,6 x 106 tona vlažne rude godišnje) Institute for mining and metallurgy, Bor 2011
Additional mining project of the overburden haulage system for haulage and disposal of the Veliki Krivelj waste into the cavity of the open pit Bor with the productivity of 4 700 t/h, (in Serbian: Dopunski rudarski projekat transportnog sistema za transport i odlaganje jalovine od površinskog kopa Veliki Krivelj do otkopanog prostora površinskog kopa Bor sa kapacitetom od 4 700 t/h) Copper institute, Bor 1995
Additional Mining Project of Transport System for Connection the Primary Crusher from the System for Mine Overburden with Stacker for the Primary Crushed Ore at the Open Pit Veliki Krivelj, Mining and Metallurgy Institute Bor, Bor, Serbia, 2011 (in Serbian: Dopunski rudarski projekat transportnog sistema za povezivanje primarne drobilice iz sistema za rudničku otkrivku sa odlagačem za primarno izdrobljenu rudu na p.k. Veliki Krivelj). Kržanović 2011
SGEM, Bulgaria Review of the achieved productivity of the combined overburden haulage system at the Veliki Kriveljopen pit – Serbia Zikic 907 2011
Mines engineering, Serbia Analysis of realized annual capacities of excavation and influencing factors at the open pit Veliki Krivelj operating within RTB Bor – Group, Serbia Žikić, 145 2011
Additional mining project of extraction and processing of the copper ore in the Veliki Krivelj ore deposit for the productivity of 10.6 M tons of wet ore per year (in Serbian: Dopunski rudarski projekat otkopavanja i prerade rude bakra u ležištu Veliki Krivelj za kapacitet 10,6 x 106 tona vlažne rude godišnje) Institute for mining and metallurgy, Bor 2011
Additional mining project of the overburden haulage system for haulage and disposal of the Veliki Krivelj waste into the cavity of the open pit Bor with the productivity of 4 700 t/h, (in Serbian: Dopunski rudarski projekat transportnog sistema za transport i odlaganje jalovine od površinskog kopa Veliki Krivelj do otkopanog prostora površinskog kopa Bor sa kapacitetom od 4 700 t/h) Copper institute, Bor 1995
Additional Mining Project of Transport System for Connection the Primary Crusher from the System for Mine Overburden with Stacker for the Primary Crushed Ore at the Open Pit Veliki Krivelj, Mining and Metallurgy Institute Bor, Bor, Serbia, 2011 (in Serbian: Dopunski rudarski projekat transportnog sistema za povezivanje primarne drobilice iz sistema za rudničku otkrivku sa odlagačem za primarno izdrobljenu rudu na p.k. Veliki Krivelj). Kržanović 2011
SGEM, Bulgaria Review of the achieved productivity of the combined overburden haulage system at the Veliki Kriveljopen pit – Serbia Zikic 907 2011
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.

