SWS Academic Research eLibraryEarth & Planetary Sciences

Scholarly record

THE SIMPLIFIED BIDDING DECISION MODEL BASED ON AHP METHOD IN ORDERING OF INVESTOR S SUPERVISION SERVICE

Lesniak, Agnieszka

First published: 2014-06-20https://doi.org/10.5593/sgem2014/b53/s21.066View metrics

Publication Impact Profile

PlumX
  • Citations
  • CrossRef - Citation Indexes: 3
  • Scopus - Citation Indexes: 3
  • Captures
  • Mendeley - Readers: 6

Publication details

Title
THE SIMPLIFIED BIDDING DECISION MODEL BASED ON AHP METHOD IN ORDERING OF INVESTOR S SUPERVISION SERVICE
Authors
Lesniak, Agnieszka
Proceedings
SGEM International Multidisciplinary Scientific GeoConference EXPO Proceedings; 14th SGEM GeoConference on ECOLOGY, ECONOMICS, EDUCATION AND LEGISLATION
Publisher
Stef92 Technology
Year
2014
Pages
Not available yet
ISSN
1314-2704
ISBN
978-619-7105-19-3
Language
en
Publication type
Conference Paper
References28
  1. Ahmad I. & Minkarah I., Questionnaire survey on bidding in construction, Journal of Management in Engineering Division, vol.4/ no.3, pp 229-243, 1988.

  2. Al-Harbi K. M. A.-S. Application of the AHP in project management, International Journal of Project Management, vol. 19, pp 19-27, 2001.

  3. Caha J., Vondrakova A. & Dvorsky J. Mathematical models of uncertainty for surface analyses and decision making, 13th SGEM GeoConference on Informatics, Geoinformatics and Remote Sensing, SGEM2013 Conference Proceedings/ ISBN 978- 954-91818-9-0 / ISSN 1314-2704, vol. 1, pp 773 – 780, 2013.

  4. Dytczak M. & Ginda G. Benefits and costs in selecting fuel for municipality heating systems with the Analytic Hierarchy Process, Journal of Systems Science and Systems Engineering, vol. 15/issue 2, pp 165-177, 2006.

  5. Leśniak A. & Zima K. The role of th e supervisor and the engineer by the FIDIC in polish construction projects", 11 International Conference Organization Technology and Management in Construction, 28 -30 September 2013, Dubrovnik, Croatia, proceedings on CD, Book of Abstract, pp 28, 2013.

  6. Plebankiewicz E. A fuzzy sets based contractor prequalification procedure , Automation in Construction, vol. 22, pp 433-443, 2012.

  7. Saaty T.L. The analytic hierarchy process. New York: McGraw-Hill, 1980.

  8. Saaty T.L. Decision making for leaders. Belmont, California: LifeTime Leaning Publications, 1985.

  9. Saaty T.L. Decision making with the analytic hierarchy process, International journal of services sciences, vol. 1/no 1, pp 83–98, 2008.

  10. Spisakova M., Hyben I. & Heredos P. Assessment of environmental risks during the construction process, 12th International Multidisciplinary Scientific Geoconference, SGEM2012 Conference Proceedings/ ISSN 1314-2704, vol. 5, pp 75-82, 2012.

  11. Tazikova A. & Kozlovska M. Achievment economic and environmental efficiency of construction using the parallel calculating costs , 13th SGEM GeoConference on Ecology, Economics, Education And Legislation, SGEM2013 Conference Proceedings, ISBN 978-619 -7105-05-6 / ISSN 1314-2704, vol. 2, pp 11 – 18, 2013.

  12. The Act of 7 July 1994 -Construction Law, (Journal of Laws of 1994 No. 89, item. 414, as amended)

  13. The Act of 29 January 2004 -Public Procurement Law, (Journal of Laws of 2004 No. 19, item. 177, as amended).

  14. Zima K. The concept of investment decision support model using fuzzy set theory, 11th International Conference Of Numerical Analysis And Applied Mathematics, ICNAAM 2013, AIP Conference Proceedings, vol. 1558, pp 1307-1311, 2013

  15. Ahmad I. & Minkarah I., Questionnaire survey on bidding in construction, Journal of Management in Engineering Division, vol.4/ no.3, pp 229-243, 1988.

  16. Al-Harbi K. M. A.-S. Application of the AHP in project management, International Journal of Project Management, vol. 19, pp 19-27, 2001.

  17. Caha J., Vondrakova A. & Dvorsky J. Mathematical models of uncertainty for surface analyses and decision making, 13th SGEM GeoConference on Informatics, Geoinformatics and Remote Sensing, SGEM2013 Conference Proceedings/ ISBN 978- 954-91818-9-0 / ISSN 1314-2704, vol. 1, pp 773 – 780, 2013.

  18. Dytczak M. & Ginda G. Benefits and costs in selecting fuel for municipality heating systems with the Analytic Hierarchy Process, Journal of Systems Science and Systems Engineering, vol. 15/issue 2, pp 165-177, 2006.

  19. Leśniak A. & Zima K. The role of th e supervisor and the engineer by the FIDIC in polish construction projects", 11 International Conference Organization Technology and Management in Construction, 28 -30 September 2013, Dubrovnik, Croatia, proceedings on CD, Book of Abstract, pp 28, 2013.

  20. Plebankiewicz E. A fuzzy sets based contractor prequalification procedure , Automation in Construction, vol. 22, pp 433-443, 2012.

  21. Saaty T.L. The analytic hierarchy process. New York: McGraw-Hill, 1980.

  22. Saaty T.L. Decision making for leaders. Belmont, California: LifeTime Leaning Publications, 1985.

  23. Saaty T.L. Decision making with the analytic hierarchy process, International journal of services sciences, vol. 1/no 1, pp 83–98, 2008.

  24. Spisakova M., Hyben I. & Heredos P. Assessment of environmental risks during the construction process, 12th International Multidisciplinary Scientific Geoconference, SGEM2012 Conference Proceedings/ ISSN 1314-2704, vol. 5, pp 75-82, 2012.

  25. Tazikova A. & Kozlovska M. Achievment economic and environmental efficiency of construction using the parallel calculating costs , 13th SGEM GeoConference on Ecology, Economics, Education And Legislation, SGEM2013 Conference Proceedings, ISBN 978-619 -7105-05-6 / ISSN 1314-2704, vol. 2, pp 11 – 18, 2013.

  26. The Act of 7 July 1994 -Construction Law, (Journal of Laws of 1994 No. 89, item. 414, as amended)

  27. The Act of 29 January 2004 -Public Procurement Law, (Journal of Laws of 2004 No. 19, item. 177, as amended).

  28. Zima K. The concept of investment decision support model using fuzzy set theory, 11th International Conference Of Numerical Analysis And Applied Mathematics, ICNAAM 2013, AIP Conference Proceedings, vol. 1558, pp 1307-1311, 2013

Citing literature

Number of times cited according to Crossref: 3

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list