
WATER TREATMENT PLANT RE-TEHNOLOGISATION, STUDY CASE A TOWN WITH 6 000 INHABITANTS
(STEF92 Technology, 2018-06-20, Dumitru, P., Girbaciu, A., Girbaciu, C., Bitea, F.)
Show more
Through this study and researches carried out in this paper, it was attempted to highlight the need for the re-equipment of the treatment station in a town with 6000 inhabitants due to the high exploitation costs, the lack of a constant discharge that satisfies the local water requirements and the quality of the drinking water currently distributed fully meet the applicable drinking law. This article presents also the exploitation optimization (from the energy point of view) of a drinking water treatment plant, ba...

