
Publication
CONSTRUCTION PRECISION SURVEY POLYGONS IN CONDITIONS OF DEVELOPMENT OF THE STAROBIN DEPOSIT OF POTASH SALTS
(SGEM Scientific GeoConference, 2003, ED. T. Denkevich, E. T. Denkevich)
Show more
In article the opportunity of construction by a precision survey polygons necessary for mutual positioning of underground mining with a margin error within the limits of 100 mm is considered. Offered decisions of this problem include optimum accommodation of points of range on a contour of mining, application of a strict way of equalizing of a polygon and gyroscopic orientation of the sides of a traverse by modern devices.
Geodesy and Mine Surveying2003
