MEASUREMENTS FOR RESTRICTING THE OBTAINED ACID DRENAGE WATERS IN SPOIL HEAP IN ORE MINING
(SGEM Scientific GeoConference, 2004, S. Mitov, NINOV, A. Kaimakchiev, SULTANOV, I. Grancharov, A. Lechev, M. Mazhdrakov)
Now showing 1 - 2 of 2

(SGEM Scientific GeoConference, 2004, S. Mitov, NINOV, A. Kaimakchiev, SULTANOV, I. Grancharov, A. Lechev, M. Mazhdrakov)

(SGEM Scientific GeoConference, 2004, B. Dimitrijevic, R. Simic, S. Ilic)
With organizing the excavation tehnology of loose raw materials through the boreholes, considering the complexity of technological operation, the most important thing is to calculate technical-technological parameters of exploitation and to make an optimal selection of pump aggregate, pipe line and pulp line, and also to project and construct the equipment for drilling and obtaining of concrete deposit conditions since there is no serial production. Hydromonitor presents its most important part that forms and dire...