
STRUCTURAL MEASURES FOR ICHTHYOFAUNAL ENVIRONMENTAL CONDITIONS IMPROVEMENT AT A SMALL HYDROPOWER PLANT
(STEF92 Technology, 2018-06-20, Dana Chițimuș)
Show more
The low head hydropower development ?Capra VI and VII? consists of two small hydropower (SHP) stations accomplished in sequence on the homonym stream in Arge? County, center Romania, each of them less than 1MW. The SHPs, study case for this paper, follow the European directives regarding the water, the environment and the green energy. Their accomplishment was based on the existing delimitation of the minor river bed for which it was noticed that the ichthyofaunal environmental conditions are not entirely achieved...

