Peer-reviewed articles 17,970 +



Title: IMPROVEMENT OF OPEN CLEANING-UP SCHEMES OF BORDER MINERAL RESERVES

IMPROVEMENT OF OPEN CLEANING-UP SCHEMES OF BORDER MINERAL RESERVES
S. Moldabayev;A. Adamchuk;N. Sarybayev;A. Shustov
1314-2704
English
19
1.3
Schemes of cleaning-up deep iron ore deposits using open pit mining method from mining-capital operations and land saving perspective are analyzed. It was established that the cleaning-up of border reserves with a pit side separation is expedient in the operation of shallow open pit mines. Cleaning-up of open pit mines with an increase in the resulting angle of slope of the side at the partial abandonment of transport communications is expedient at the transition stage from the auto truck-rail transport to the auto truck-conveyor or auto truck-skip transport. The scheme with the complete elimination of the transport pillars is advisable while building a transport conveyor gallery or skip rails on the pit side being cleaned up and while opening deep horizons of open pit mine. Existing inter-bench transshipment devices of Ukrainian production were analyzed. It was established that in the conditions of cleaning-up transport pillars by an open pit method, it is advisable to use skips as a load-carrying body of inter-benches reloaders. Rational parameters for the use of inter-benches loaders of new design are defined.
conference
19th International Multidisciplinary Scientific GeoConference SGEM 2019
19th International Multidisciplinary Scientific GeoConference SGEM 2019, 30 June - 6 July, 2019
Proceedings Paper
STEF92 Technology
International Multidisciplinary Scientific GeoConference-SGEM
Bulgarian Acad Sci; Acad Sci Czech Republ; Latvian Acad Sci; Polish Acad Sci; Russian Acad Sci; Serbian Acad Sci & Arts; Slovak Acad Sci; Natl Acad Sci Ukraine; Natl Acad Sci Armenia; Sci Council Japan; World Acad Sci; European Acad Sci, Arts & Letters; Ac
331-338
30 June - 6 July, 2019
website
cdrom
5235
open pit mining; skip hoist; cleaning-up parameters