Abstract
Drilling and blasting is the oldest excavation method in mining and tunnelling applications especially in hard rock conditions. But in recent year, the application of roadheaders and impact hammers in hard rock conditions has increased considerably in both civil and mining engineering fields. The prediction of machine utilization time and determining performance plays an important role in the time scheduling of the tunnelling projects. The tunnels of the Kadikoy-Kartal Metro are under construction. This paper summarizes the construction methods of the Kadikoy-Kartal Metro tunnels and the performance of the roadheader and impact hammer. At the same time, machine utilization time was compared for roadheader and impact hammer for Kozyatagi Station. Average uniaxial compressive strength (UCS) for roadheader (402 HP) 132 MPa, for impact hammer (143 HP) 58.3 MPa. UCS was obtained from daily face blocks in laboratory. The result of this study show that machine utilization time for roadheader 28.2 \% and for impact hammers 13.7 \%.
Publication details
References7
Istanbul Metropolitan Municipality, 2006, The Transportation System of Istanbul Kadikoy-Kartal Metro Line: Geotechnical Report of Tunnel Construction 8+000 km and 1 1+000 km, Istanbul.
Istanbul Metropolitan Municipality, 2002, Technical Contract of Istanbul Kadikoy-Kartal Metro Line Construction.
IMM, Istanbul Metropolitan Municipality, 2006, Istanbul Metropolitan Municipality, General Directorate of IETT, Kadikoy-Kartal Railway Public Transportation System, Kozyatagi Pl Tunnel Project.
Copur, H., Czdemir, L., Rostami, J., 1998, Roadheader applications in mining and tunneling. Mining Engineering, 50 (3), 38-42.
Thuro, K., Plinninger, RJ., 1998, Geological limits in roadheader excavationfour case studies. 8th International IAEG Congress, Vancouver, vol. 2, pp. 35453552.
Bilgin, N., Dincer, T, Copur, H., 2002. The performance of impact hammers from Schmidt hammer rebound values in Istanbul tunnel drivages. Tunnelling and Underground Space Technology 17, 237-247.
Tuncdemir, H. 2007, Impact hammer applications in Istanbul metro tunnels, Tunnelling and Underground Space Technology, 23, 264-272
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.