Scholarly record
RISKS OF OPEN-PIT ADVANCE IN THE VICINITY OF THE VENUSE COAL ASH POND AT DB MINE SITE, SD A.S.
Abstract
Currently, the mining company Severoceske doly a.s. is preparing a plan for advance of the Bilina open-pit site within the borders of the newly established territorial limits of environmental impact, which are established by resolution of the Government of the Czech Republic No. 827/2015 Coll. To create permanently stable pit slopes and safe mining activity, exploitation will extend to the southern outcrop of the coal seam and overburden benches will move further westward. In the next process of the open-pit mine, the wet storage of ashes ? New ash disposal site from UNIPETROL RPA s.r.o. will be approached. Ash wet storage is expected there until 2032. Subsequent technical reclamation within the construction of the new ash disposal site (coal-ash pond Venuse) is not considered before 2035. It is not possible to guarantee such an adjustment of the water system, which will completely guarantee safe mining activity and the final stages of the reclamation of the coal-ash pond. Therefore, a temporary protecting pillar is proposed in accordance with Decree of the Czech Mining Authority No. 415/1991 Coll. on the construction, preparation of documentation and establishment of protective pillars and zones for the protection of mining and surface objects. Lignite mining in the specified mining area takes place in open-pit operations. The extraction of overburden cuts is a major change in the groundwater regime, as well as surface waters in the area concerned and in the wider surroundings. For this reason, it will continue to be necessary to monitor and maintain the surface of water table of these waters at a tolerable level due to the negative impact of mining and surrounding buildings.
Publication Impact Profile
Publication details
References5
Černoch P., Janků J.: Interní materiály společnosti INSET s.r.o.., Rešeršní zhodnocení hydrogeologické problematiky v oblasti kontaktu s Venuší, Praha 2017
Hájek V., Libus J.: Interní materiály společnosti GeoTec-GS, a.s., Projekt ochranného pilíře odkaliště Nová popelová skládka, Praha 2018
Libus J., Růžika J., Zmítko J.: Interní materiály společnosti GeoTec-GS, a.s., Rizika postupu lomu Bílina do prostoru plaviště Venuše, Teplice 2013
Bílý I., Brabenec J., Vaněk P.: Disposal of muddy sediments and their effect on the oveerburden dump body stability within the environment of opencast brown coal mines. In 15th International Multidisciplinary Scientific GeoConference SGEM2015: GeoConference on Science and Technologies in Geology, Exploration and Mining: 18- 24 June 2015, Albena, Bulgaria: conference proceedings
Zájmová oblast [online]. [cit. 2020–2-5]. Dostupné z: https://www.google.cz/maps/@50.5700826,13.7146131,6268m/data=!3m1
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.


