DISPLACEMENT MEASUREMENTS DURING LOAD TESTING OF THE RAILWAY ARCH BRIDGE
Abstract
The paper discusses issues concerning load tests carried out on a twin-track, arch railway bridge over the Martwa Wisla river in Gdansk. Currently, it is the bridge with the longest span in its class in Poland. The load-bearing structure consists of three no-hinge arches and an orthotropic deck suspended from them. The studies of the structure assumed the performing of static and dynamic tests. The paper presents the method for carrying out geodetic measurements during static tests as well as the analysis of obtained results. The main emphasis was on the total station measurements and precise leveling. Data was obtained concerning deck and arch displacements at controlled points and also on abutment subsidence. The tests allowed for both evaluation of the structural response under the load and verification of the safety of structure usage. The tests demonstrated that when the bridge is exposed to load, it behaves in accordance with the design assumptions and, therefore, the object can be put into operation.
Publication Impact Profile
Publication details
References0
Structured references will appear here after the reference import pass. The count is preserved now so the scholarly record is not incomplete.
Citing literature
Number of times cited according to Crossref: 2
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.