SWS Academic Research eLibraryEarth & Planetary Sciences

Scholarly record

THE IMPACT OF ARMING METHODS IN SECURITY SCALE DURING THE APPLICATION OF FRONTAL METHODS IN MINE TREPCA IN STANTERG

Izet Zeqiri

First published: 2011-06-20https://doi.org/10.5593/sgem2011/s03.145View metrics

Abstract

Mining bodies that lay in the depth of Earth’ s core always appear as irregular bodies in different geological- mining circumstances. Mine “Trepça” in Stanterg since the beginning of its work in 1930 up to now has applied several exploitation methods of mining bodies, and one of these methods is the so called Frontal Method. This method is applied in cases when the ore body has small sizes in length from 30m and the fall angle up to 30º. During the app lication of this method, the securing backbones have been engaged as well in orde r to secure the ceiling part, and according to this the annual production has been increased and the exploitation time has been shortened respectively. The purpose of this work is to make the exploitation of such mining bodies while using securing backbones so during the last phase the exploitation of backbones in lifting would be possible. This method has not been applied in Mine “Trepça” in Stantërg yet, but according to a deep analysis this method could be applied.

Publication Impact Profile

PlumX
  • Citations
  • CrossRef - Citation Indexes: 2
  • Captures
  • Mendeley - Readers: 2

Publication details

Title
THE IMPACT OF ARMING METHODS IN SECURITY SCALE DURING THE APPLICATION OF FRONTAL METHODS IN MINE TREPCA IN STANTERG
Authors
Izet Zeqiri
Proceedings
SGEM International Multidisciplinary Scientific GeoConference EXPO Proceedings; SGEM2011 11th International Multidisciplinary Scientific GeoConference
Publisher
Stef92 Technology
Year
2011
Pages
Not available yet
ISSN
1314-2704
ISBN
Not available yet
Language
en
Publication type
Conference Paper
Keywords
References7
  1. Prof.Dr. Sefedin Kastrati lecture on subject “Specific and special methods in underground exploitation”, Stady Master 2010 Mitrovice FXM

  2. Mathematical Methods in Engineering Sh. Kelmendi, I.Zeqiri, Mitrovicë, 2006

  3. Jorgji, S.Ristani, Construction of underground works (first stage) Tiranë,2004

  4. V.Jorgji,S.Ristani – Construction of underground works (first stage) Tiranë-2004

  5. Beqir Mehmeti, Rocks and land mechanics (Selected Chapters) Mitrovicë, 2000

  6. H.Sauku – Construction of mining works. (first stage) Tiranë – 1985

  7. S.Guxha –Exploitation of underground deposits of useful minerals, stage I-II-III Tiranë, 1984.

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list