Abstract
In this research, the study site is a limestone quarry Ain El-Kebira located in the wilaya of Setif (Northwest -Algeria) producing limestone for cement manufacturing. The present work represents a study to measure the granulometric distribution of the blasted rock using the digital image processing software WipFrag and empirical model KuzRam, in order to evaluate the efficiency of the blasting operation and ensure the stability of the benches. In this work, we will simulate the method of exploitation while analyzing the effect of exploitation (digging trenches cutting by explosive) on the stability of the northern flank of Ain El-Kebira quarry. The calculation was carried out by phases (excavation sequence taking into account the phase before the exploitation) in different areas of the steps (5 blasts) in order to target the dangerous working platforms. It can be seen as a conclusion that the measurement of rock size by both empirical and numerical methods (KuzRam and WipFrag) gave almost similar results with accuracy of WipFrag. The change of some parameters of the blasting plan having an important influence on the blasting area, the use of large quantity of explosive negatively influenced the dimension of the fragmented rocks and the stability of the quarry edge, the use of stability software targeted the dangerous zones of the blasting (in our case software phase2 gave ideal results), these results helped the engineer for better design of the blasting plan.
Publication Impact Profile
Publication details
References11
Jug, J., et al., Fragment size distribution of blasted rock mass. IOP Conference Series: Earth and Environmental Science, 95 (4), 1�9, 2017. DOI: 10.1088/1755-1315/95/4/042013
Gheibie, S., et al., Modified Kuz-Ram fragmentation model and its use at the sungun copper mine. International Journal of Rock Mechanics and Mining Sciences, 46 (6), 967� 973. 2009. DOI: 10.1016/j.ijrmms.2009.05.003
Akbari, M., et al., Blastability evaluation for rock mass fragmentation in Iran central iron ore mines. International Journal of Mining Science and Technology, 25 (1), 59�66. 2015. DOI: 10.1016/j.ijmst.2014.11.008
Elahi AT, Hosseini M. Analysis of blasted rocks fragmentation using digital image processing (case study: limestone quarry of Abyek Cement Company). International Journal of Geo-Engineering;8(1):16. 2017. Doi.org/10.1186/ s40703-017-0053-z, DOI: 10.1186/s40703-017-0053-z
A Saadoun, A. Hafsaoui, Y. Khadri, M. Fredj, R.Boukarm & R.Nakache �Study effect of geological parameters of the slope stability by numerical modelling, Case limestone Career of Lafarge Msila, Algeria� IOP Conf. Series: Earth and Environmental Science. 2019. DOI: 10.1088/1755-1315/221/1/012021
M Djoudi., S Bensehamdi., M Fredj. Study of blasting effect on bench stability. IOP Conf. Ser.: Earth Environ. Sci. 833 012196. 2021. DOI: 10.1088/1755-1315/833/1/012196
M Fredj, A Hafsaoui, R Boukarm, R Nakache, A Saadoun. Numerical Modelling of Slope Stability in Open Pit Phosphate Mines, Algeria: A Comparative Study IOP Conference Series: Earth and Environmental Science 221 1 012020. 2019. DOI: 10.1088/1755-1315/221/1/012020
Saadoun A., Fredj M., Boukarm R., Hadji R. Fragmentation analysis using digital image processing and empirical model (KuzRam): a comparative study. Journal of Mining Institute. Vol. 257, p. 828-838. 2022. DOI: 10.31897/PMI.2022.84
M Fredj, A Hafsaoui, K Talhi, K Menacer. Study of Powder Factor in Surface Bench Blasting. Procedia Earth and Planetary Science. Science Direct. 2015. DOI: 10.1016/j.proeps.2015.08.142
Abderrazak Saadoun et al. Different Approaches for Study Slope Stability in Quarries, Case Chouf Amar Limestone Quarry M�sila, Algeria IOP Conf. Ser.: Earth Environ. Sci. 609, 012093, 2020. DOI: 10.1088/1755-1315/609/1/012093
Bamford, T., et al, A real-time analysis of post-blast rock fragmentation using UAV technology. International Journal of Mining, Reclamation and Environment, 31 (6), 439� 456. 2017. Doi:10.1080/ 17480930.2017.1339170. DOI: 10.1080/17480930.2017.1339170
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.