Scholarly record
DETERMINING OF MINING TRANSPORT CAPACITY BY SIMULATION
Abstract
Research discussed in the present article is focused on the determination of the mining rail transport capacity while applying two approaches. The first one - a conventional one, is a calculation of capacity while using known mathematical formulas. The second one - an experimental approach, identifies the capacity on the basis of simulation application, as the simulation has remarkable potential also in terms of further research in the given area. The simulation model was created in EXTENDSim, a product of Imagine That, Inc. USA. Based on the results of the calculations and the simulation, conclusions are drawn. Calculation and simulation gave comparable results. This calculation and model are applicable in practice as an auxiliary tool for the planning of transport during the mining transport of raw materials. The simulation model presented in this paper is only one possible solution. Of course, the model is not the final version, it can be further expanded for other activities. This is the recommendation for further research.
Publication Impact Profile
Publication details
References0
Structured references will appear here after the reference import pass. The count is preserved now so the scholarly record is not incomplete.
Citing literature
Number of times cited according to Crossref: 1
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.

