Scholarly record
AN IT PLATFORM AS A TOOL FOR ANALYSING THE WORK OF MINING MACHINES
Abstract
The machines used in hard coal mining must exhibit very good technical, safety and reliability parameters. These parameters determine their efficiency, operational safety and effectiveness of the entire production process. The last several decades have seen increased mechanisation of the mining process. Increasingly more cutting-edge and efficient machines have been used for this purpose. Attempts have also been made to partially or fully automate the process of mining. The concept of an ?intelligent? mine has come into being. However, the reality verified these plans. It turned out that the changeability and unpredictability of the mining and geological conditions in which the coal exploitation process takes place limit the possibilities of implementing its full automation. However, the current level of technical equipment in mines and the mining technologies in use allowed for virtually full mechanisation of this process. The article demonstrates an IT solution which, in the Authors? opinion, may contribute to improving the operating effectiveness of mining machines. This solution is represented by an IT platform whose task is to exchange information between all the participants of the coal production process. In the example at hand, it encompasses the machines constituting an automated longwall system. The platform allows for regular monitoring of the operating status of the individual machines. This is possible thanks to the application of industrial automation systems which register the operating parameters of these machines. The data obtained are pre-processed and then, according to pre-set algorithms, the assumed indicators are determined. The use of the platform makes it possible to exchange information between machines operators, dispatchers, the maintenance department and the mine?s management. This particularly applies to failures and unscheduled downtimes of the machines. The preliminary results of this solution are very optimistic. However, it should be emphasised that broader implementation of this solution may, at least in the initial period, cause dissatisfaction amongst part of the crew. Nevertheless, the approach adopted seems to be legitimate, especially due to development of the idea of the fourth industrial revolution. These measures should, over time, contribute to the improvement of the operating effectiveness of mining machines in the mining process of hard coal and other useful minerals.
Publication Impact Profile
Publication details
References15
Brodny J., Tutak M., Analysis of methane emission into the atmosphere as a result of mining activity. SGEM 2016, Book 4 Vol. 3, pp. 83-90, 2016. DOI: 10.5593/SGEM2016/HB43/S06.012
Kłosok-Bazan I., Innovations in industrial water preparation in a metallurgical plant. Metalurgija, vol.55 pp. 59-62, 2016.
Loska A., Exploitation assessment of selected technical objects using taxonomic methods. Maintenance and Reliability Vol.15, No. 1, p. 1-8, 2013.
Loska A., Scenario modeling exploitation decision-making process in technical network systems. Maintenance and Reliability 2017; Vol.19, No. 2, p. 268–278, DOI: 10.17531/ein.2017.2.15.
Mallikarjuna R. Ghattamneni, Integrating ERP Business Components into SAP S/4 HANA Cloud Edition - A Functional and Technical. American Journal of Computer Architecture. 2016; 3(1): 1-7 DOI: 10.5923/j.ajca.20160301.01
Palka D., The role and importance of training for improving the safety and awareness of the technical staff in the mining plant. CBU International Conference Proceedings 2017: Innovations in Science and Education, Vol. 5, Prague 2017, pp. 1195-1198, 2017. DOI: 10.12955/cbup.v5.1095
Palka D., Brodny J. Stecula K., Modern means of production and the staff awareness of the technical in the plant of the mining industry. CBU International Conference Proceedings 2017: Innovations in Science and Education, Vol. 5, Prague 2017, p. 1190-1194, 2017. DOI: 10.12955/cbup.v5.1094
Palka D., Hombek P., Analysis of impact of OHS training quality on knowledge of workers in mining companies in the field of occupational safety. Conference proceedings. Vol. 17, Science and technologies in geology, exploration and mining. Iss. 13, Exploration and mining. Sofia: STEF92 Technology, 2017, p. 61-68, 2017. DOI: 10.5593/sgem2017/13/S03.009
Paszkowski W., Loska A. (2017). The use of neural network model in the assessment of annoyance of the industrial noise sources. In: Burduk A., Mazurkiewicz D. (eds) Intelligent Systems in Production Engineering and Maintenance – ISPEM. Advances in Intelligent Systems and Computing, vol. 637, 428-439.
Stecula K., Brodny J., Palka D., Analysis of reasons for unplanned stoppages of ma-chines in the example of the longwall shearer. CBU International Conference Proceedings 2017: Innovations in Science and Education, Vol. 5, Prague 2017, p. 1210-1214, 2017. DOI: 10.12955/cbup.v5.1098.
Stecula K., Brodny J., Tutak M., Use of intelligent informatics module for registration and assessment of causes of breaks in selected mining machines. Intelligent Systems in Production Engineering and Maintenance ISPEM 2017, Advances in Intelligent Systems and Computing 637, pp.74-84, 2017. DOI: 10.1007/978-3-319-64465-3_8
Stecula K., Brodny J., Tutak M., Informatics platform as a tool supporting research regarding the effectiveness of the mining machines’ work CBU International Conference Proceedings 2017: Innovations in Science and Education, Vol. 5, Prague 2017, p. 1215-1219, 2017. DOI: 10.12955/cbup.v5.1099
Szurgacz D., Brodny J., Analysis of rock mass dynamic impact influence on the operation of a powered roof support control system. E3S Web Conferences Volume 29, E3S Web of Conferences eISSN: 2267-1242, EDP Sciences; 2018. DOI: 10.1051/e3sconf/20182900006
Szurgacz D., Brodny J., An Innovative System to Test Components of Mining Machinery Control Hydraulics. SGEM 2017. Vol. 17, issue 13, pp. 47-54, 2017. DOI: doi.org/DOI: 10.5593/sgem2017/13
Szurgacz D., Analysis characteristics determination of electrohydraulic control system operation to reduce the operation time of a powered roof support. E3S Web of Conferences 29, 00007, XVIIth Conferences of PhD Students and Young Scientist, 2018. DOI: 10.1051/e3sconf/20182900006
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.


