Scholarly record
DESIGN AND INTRODUCING A REAL-TIME ASSIGNMENT SOFTWARE OF TRUCK-SHOVEL SYSTEM
Abstract
There are two methods fixed and real-time assignment for improving the performance of transportation through truck- shovel system in open pit mines. The real-time assignment (RTA) method is a better manner for optimization process of transportation system in open pit mines, especially in the complex transportation systems. The most significant objective of the RTA method is, introducing a transportation system which cause to increasing production per time and decreasing cost per ton. In this study, a software based on RTA of truck-shovel was designed and presented. The basis of software logic is heuristic algorithm. To introduce software performance, transportation system of Bafgh iron ore mine, located in central Iran, was assessed for validation, and obtained results of the mentioned software was compared with results of the ARENA package.
Publication details
References14
Temeng, 1997: A Computerized Model for Truck Dispatching in OpenPit Mines, PhD Dissertation, Michigan Technical University.
White and Olson, 1992: On improving truck/shovel productivity in open pit mines. In Proceedings 23rd Conference on Application of computers and Operations Research in the Mineral Industry, SME, pp. 739-
Zhang and Cai, 1991: Optimization Criteria for Computer Controlled Truck Dispatching System, In Proceedings 22nd Conference on Application of Computers and Operations Research in the Mineral Industry, Berlin Germany, pp 297-306.
Bissiri, Y., 2002: . Application of Agent-based Modeling to Truck-Shovel Dispatching Systems in Open Pit Mines. PhD thesis, Department of Mining Engineering, University of British Columbia.
Bonabeau, E., Dorigo, M., and Theraulz, G., 1999: Theraulz, G., Bonabeau, E., Schatz, B., and
Deneubourg, J-L., 2002.
Theraulz, G., Bonabeau, E., Schatz, B., and Deneubourg, J-L., 2002: Task partitioning in a ponerine ant. J.Theoretical Biology, 215, pp. 481-489.
W. Scott Dunbar., 2002: Let the Ants do the Dispatching. Department of Mining Engineering University of British Columbia Vancouver, BC, Canada.
Elbrond and Soumis 1987: Towards integrated production planning and truck dispatching in open pit mines. Int. J. Surf. Mining, 1987, pp. 1 –6.
Lizotte, Y., Bonates, E. and Leclerc, A., 1989: Analysis of truck dispatching with dynamic heuristic procedures.
Soumis, F., Ethier, J. and Elbrond, J., 1989: Evaluation of the new truck dispatching in the Mount Wright Mine, in 21rd APCOM Proceedings,1989, pp. 674 –682.
Xi, Y. and Yegulalp, T.M., 1994: Optimum dispatching algorithm for Anshan open-pit mine, in 24th APCOM Proceedings.
Temeng, V.A., Francis, O.O. and Frendewey, Jr., J.O., 1997: Real-time truck dispatching using a transportationalgorithm. Int. J. Surf. Mining, Reclam. Environ., 1997, 11, 203 –207.
Simorghi, R. G., 2007: Introducing a combinational model of fix and real-time assignment transportation system in Bafgh (Choghart) iron ore mine., Unpublished MSc. Thesis, Amirkabir University of Technology, Iran.
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.
