Small hydroelectric power plants (SHPP) are accepted by the legislation of EU Member States to benefit from renewable energy promotion scheme through various market mechanism. The SHPPs are a particular form and case of hydroelectric power plants (HPP) and are having a maximum capacity of 10 MW. Since the green certificate (GC) promotion scheme was awarded in Romania (2008), a considerable number of SHPP were constructed and commissioned in the last years. These projects have the same philosophy as a large hydro, but their impact on the environment is considered to be less due to the dimensions of their structures. Also the dimensions of units below 10 MW are much reduced than bigger units. The entire technical parameters are different in SHPP than regular HPP therefore we find higher speeds of the machines, simple construction of hydraulic structures, less equipment and auxiliary systems, reduced dimensions of turbines, generators or inlet valves that are having an important influence in their complexity. Comparing to a 55 MW Francis unit that has a nominal speed of 375 rpm, a 400 kW Francis unit could reach easily 1000 or 1500 rpm. This will reduce the number of electromagnetic pols of generator and therefore its dimensions and more important the manufacturing cost. However, the maintenance requirements of the other components remain the same as in large project or even higher. As an example, the bearings of the turbine are subject to a higher speed and wear, the water has a higher speed through turbine and guided vanes. Also a SHPP that is built on a derivation layout, does not have a large reservoir that allows the regulation of discharge in order to limit the number of start-ups per day. The SHPP will start depending on the water availability in the forebay tank and will shut down when the minimum level its achieved. This is causing higher stress of material, fatigue and additional wear of mechanical equipment. Most of the SHPP that were built are subject to maintenance works as they exceeded warranty period. It is very important to plan the maintenance during periods with low hydrology, especially in summer. The limitation in water storage capability of any SHPP generates significant energy losses when maintenance is required. It is very important to know and understand the actual state of the machines in order to optimize maintenance in order to maximize energy generation and minimize any losses. Therefore, it might be the case of establishing a limitation in operation until maintenance conditions are met. This article aims to presents the results in the field of SHPP maintenance by using vibrations measurements and numerical simulation in order to determine the actual state of the units and for their components, and to obtain enough knowledge to properly organize the entire maintenance program.

Publication Impact Profile

PlumX
  • Citations
  • Scopus - Citation Indexes: 1
  • Captures
  • Mendeley - Readers: 6

Publication details

Title
DEVELOPING MAINTENANCE PROGRAM FOR SMALL HYDROELECTRIC POWER PLANT USING VIBRATION MEASUREMENTS AND SIMULATION
Authors
Assoc. Prof. Cornel Dumitru Ilinca, Assoc. Prof. Vlad Florin PIRAIANU
Proceedings
SGEM International Multidisciplinary Scientific GeoConference EXPO Proceedings; 17th International Multidisciplinary Scientific GeoConference SGEM2017, Energy and Clean Technologies
Publisher
STEF92 Technology
Year
2017
Pages
183-190
SWS Citekey
Ilinca201717183190
ISSN
1314-2704
ISBN
978-619-7408-07-2
Language
en
Publication type
Conference Paper
Keywords
References0
0references registered for this publication

Structured references will appear here after the reference import pass. The count is preserved now so the scholarly record is not incomplete.

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list