SWS Academic Research eLibraryEarth & Planetary Sciences

Scholarly record

STAKEHOLDER ENGAGEMENT PLAN, CASE PROJECTS ON KOLUBARA MINE BASIN

Jelena Milosavljević

First published: 2011-06-20https://doi.org/10.5593/sgem2011/s03.141View metrics

Abstract

Public Enterprise Elektroprivre da Srbije (EPS - Electric Power Industry of Serbia), the dominant electricity producer in Serbia, is a 100% state-owned public company. The Kolubara Mining Basin (MB Kolubara) with its open cast mines is one of 11 subsidiaries of EPS. In accordance with the Serbian Energy Strategy by 2015, one of the EPS priorities is a modernization and improvement of the efficien cy of EPS' coal mining operations at the Kolubara basin and significantly improvement the quality and uniformity of the lignite it delivers to EPS’ power sta tions. Further to that, EPS and MB Kolubara develop new projects. All of those projects might have some social and environmental influence on the society. As a social responsible companies, r ecognised the communications with the stakeholders as a very important issue, EP S and MB Kolubara prepared the Stakeholder Engagement Plan (SEP). This SEP has been designed to guide current and future stakeholder engagement activities of EPS a nd RB Kolubara in rela tion to the mention projects. Taking into consideration specifics of the above mention projects, this paper dealing with the detail explanation of the pr oposed SEP. Although EPS has no operational responsibilities for stakeholder engagement and resettlement activities (these are the responsibility of MB Kolubara), it liaises with the relevant ministries and has a strategic oversight role. MB Kolubara is responsible for engagement and implementing resettlement at the local level, in cooperation with the m unicipal authorities and it has a direct relationship with the relevant Minist ries. Throughout this SEP, specific reference is therefore made to both EPS and RB Kolubara depending on the competence.

Publication Impact Profile

PlumX
  • Captures
  • Mendeley - Readers: 3

Publication details

Title
STAKEHOLDER ENGAGEMENT PLAN, CASE PROJECTS ON KOLUBARA MINE BASIN
Authors
Jelena Milosavljević
Proceedings
SGEM International Multidisciplinary Scientific GeoConference EXPO Proceedings; SGEM2011 11th International Multidisciplinary Scientific GeoConference
Publisher
Stef92 Technology
Year
2011
Pages
Not available yet
ISSN
1314-2704
ISBN
Not available yet
Language
en
Publication type
Conference Paper
Keywords
References8
  1. Constitution of the Republic of Serbia (OG No. 83/06)

  2. The Law on Free Access to Public Information, (OG No. 120/04)

  3. The Law on Environmental Protection (OG No. 134/04 and 36/09)

  4. The Law on Environmental Impact Assessment (OG No. 134/04, 80/05 and 36/09)

  5. The Law on Strategic Environmental Impact Assessment (OG No. 134/04)

  6. The Law on Integrated Pollution Prevention and Control (OG No. 134/04)

  7. ''Arhus Convention'', Convention on access to information, PP in decision-making and access to justice in environmental matters. (1998)

  8. SEP - Stakeholder Engagement Plan, www.rbkolubara.rs

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list