REVIEW OF THE ACHIEVED PRODUCTIVITY OF THE COMBINED OVERBURDEN HAULAGE SYSTEM AT THE VELIKI KRIVELJ OPEN PIT - SERBIA

Miodrag Žikić

First published: 2011-06-20https://doi.org/10.5593/sgem2011/s03.134View metrics

Abstract

The open pit Veliki Krivelj is a copper mine which operates within RTB Bor Group in Serbia. In 1998 a combined haulage system involving the initial dump truck haulage, crusher, belt conveyor and a boom spreader for waste disposal was designed and installed in order to reduce the costs on overburden removal. The designed productivity of the system is 4 700 t/h and it will be fully operational in the next few weeks. Up to date it has been capable of achieving maximal 50% of this productivity because only one of two designed crushers was installed. This paper gives an overview of the achieve d annual productivities of the system in the period from 1998 to 2010 as well as the necessary explanations of the reasons of the low productivity utilization. The presented data can be useful to those mining experts who are considering implementation of similar combined haulage systems.

Publication Impact Profile

PlumX
  • Captures
  • Mendeley - Readers: 3

Publication details

Title
REVIEW OF THE ACHIEVED PRODUCTIVITY OF THE COMBINED OVERBURDEN HAULAGE SYSTEM AT THE VELIKI KRIVELJ OPEN PIT - SERBIA
Authors
Miodrag Žikić
Proceedings
SGEM International Multidisciplinary Scientific GeoConference EXPO Proceedings; SGEM2011 11th International Multidisciplinary Scientific GeoConference
Publisher
Stef92 Technology
Year
2011
Pages
Not available yet
ISSN
1314-2704
ISBN
Not available yet
Language
en
Publication type
Conference Paper
Keywords
References5
  1. Technical documentation of the Planning and analysis of copper ore and concentrate production sector of the RBB, Bor, 2011.

  2. The main mining project of extraction and processing of the copper ore in the Veliki Krivelj ore deposit for the productivity of 8M tons of wet ore per year (in Serbian: Glavni rudarski pojek at otkopavanja i prerade rude bakra u ležištu Veliki Krivelj za kapacitet od 8 x 106 tona vlažne rude godišnje), Copper institute, Bor, 1978.

  3. Additional mining projec t of the overburden haulage system for haulage and disposal of the Veliki Krivelj waste into the cavity of the open pit Bor with the productivity of 4 700 t/h, (in Serbian: Dopunski rudarski projekat transportnog sistema za transport i odlaganje jalovine od površinskog kopa Veliki Krivelj do otkopanog prostora površinskog kopa Bor sa kapacite tom od 4 700 t/h), Copper institute, Bor,

  4. Additional mining project of extraction and processing of the copper ore in the Veliki Krivelj ore deposit for the productivity of 10.6 M tons of wet ore per year (in Serbian: Dopunski rudarski projekat otkopa vanja i prerade rude bakra u ležištu Veliki Krivelj za kapacitet 10,6 x 10 6 tona vlažne rude godišnje), Institute for mining and metallurgy, Bor, 2011.

  5. Simplified mining project for Veliki Krive lj waste disposal into the cavity of the open pit Bor, (in Serbian: Uprošćeni rudarski projekat odlaganja jalovine sa površinskog kopa Veliki Krivelj u otkopani prostor površinskog kopa Bor), Technical faculty in Bor, Bor, 2010.

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list