SWS Academic Research eLibraryEarth & Planetary Sciences

Scholarly record

ESTIMATION OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING TUNNEL EXCAVATION

O. Durmus, A. Kesimal, B. Ercikdi, F. Cihangir

First published: 2005DOI pendingView metrics

Abstract

“The Black Sea Coastal Way Rehabilitation Project” which started seven years ago in order to relief in traffic flow in the Eastern Black Sea Region of Turkey and presently continues to complete their constructions. The project involves the rehabilitation and shortening of the present motorway and hence the construction of new tunnels and riprap material for filling the sea are required in some places. This paper involves one of the blast based tunnel excavations, which is performed for “Yoroz Tunnel” situated in Trabzon in north-east Turkey and presents the results of ground vibration measurements induced by blasting. Within the scope of the study, ground vibration components were measured using vibration monitor at different locations for blast events during the advancement of about 260 meters length of the tunnel. The tunnel is in a residential part of the region. There are some houses on the top and some 70 meters close to the surrounding tunnel. The local residents complaints about the ground vibration, air-shock and noise from the tunnel blasts. A total of 32 blast events measurements were made for the estimation of the peak particle velocity and to determine the slope of the attenuation curve together with the maximum charge per delay for the test site. At the end of the statistical analysis of the data pairs, a final relation was developed between peak particle velocity and scaled distance in terms of geological factors. Finally, experiences gained during the blast based tunneling and the accumulated information presented here are believed to be useful and reliable for a successful tunnel excavation in similar formations.

Publication details

Title
ESTIMATION OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING TUNNEL EXCAVATION
Authors
O. Durmus, A. Kesimal, B. Ercikdi, F. Cihangir
Proceedings
5th International Scientific Conference - SGEM2005
Publisher
SGEM Scientific GeoConference
Year
2005
Pages
273-280
ISSN
1314-2704
ISBN
954-918181-2
Language
en
Publication type
Conference Paper
Proceedings contents
Open official contents
References2
  1. • Kahriman, A., "Predictability of the Ground Vibration Parameters Induced by Blasting During The Tunneling", Mineral Resour ces Engineering, Vol. 11, No. 3, 2002,

  2. 291. • Kahriman, A., Kesimal, A., Tuncer, G., Prediction and Measurement of Environmental Problems Produced From Blasting, Second International Symposium on Mine Environmental Engineering, 1998, 231-239. • Erçıkdı, B., Kesimal, A., Y ılmaz; Evaluation of ground vibrations induced by blasting at Arakl ı-Taşönü limestone quarry, VII.th Regional Rock Mechanics Symposium, pp. 337-347, 2004a. • Erçıkdı, B., Kesimal, A., Yılmaz, E., Safety Evaluation Of A Historic Place and School Close To Limestone Quarry Blasts, International Conference

View or Download full articleAccess options
Full paper accessChoose SWS login, librarian support, or instant article download.

SWS access login

Login as SWS Scientific Committee

Authors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.

For librarian assistance: [email protected]

Purchase Instant Access

48-hour online accessComing soon
Online-only accessComing soon
Download the full article in PDF formatEUR 35
  • Article can be downloaded after successful payment.
  • Article may be used according to SWS library access terms.
  • Article cannot be redistributed.
Get full paper

Back to publication list