PASTE BACKFILL PREPARATION AND APPLICATION FOR UNDERGROUND BACKFILLING PROCESS
(SGEM Scientific GeoConference, 2004, E. Yilmaz, A. Kesimal, B. Ercikdi)
Show more
Paste backfill was first developed by Preussag at the Bad Grund Mine. Filtered tailings were combined with 30 mm heavy media separation tailings to produce a paste backfill. These ingredients were combined and mixed on surface and pumped to the underground mine using two Putzmeister concrete pumps working in parallel. Dry cement was added to the paste mixture just prior to being placed into the stope. The resulting fill then formed the roof for the next cut using an undercut and fill mining method. The experimenta...