
DETERMINING PROCEDURE FOR THE POSITION OF THE SUPPORT ELEMENTS AND GUIDANCE AT WINDING SHAFTS
(STEF92 Technology, 2019-06-20, Cornel Arsene)
Show more
The safe operation of the installation of a winding shaft is ensured by the vertical continuity of the guiding and the vertical overlap of the moise cross section. When digging the mine shaft, the topographer has the task of conducting, besides the performance of the vertical work, the installation of moise gaskets and the guiding when in relation to the shaft axes. Guiding and moise assembly operations require increased attention, given the role these elements play in the subsequent work of the shaft and its smoo...
