
FINITE ELEMENT METHOD ANALYSIS OF THE CROWN PILLAR STABILITY IN THE CASE OF THE RO?IA POIENI COPPER DEPOSIT
(Stef92 Technology, 2013-6-20, Ilie Onica)
Now showing 1 - 5 of 5

(Stef92 Technology, 2013-6-20, Ilie Onica)

(Stef92 Technology, 2013-6-20, Ilie Onica)

(Stef92 Technology, 2011-06-20, Ilie Onica)
In the case of this thick and gentle coal seam no.3 of the Jiu Valley coal basin (Romania), the mining methods are by use of the longwall mining technologies with roof control by caving or top coal caving. In this paper, it is presented the analysis of the complex deformations of ground surface, over time, as a consequence of the coal mining in certain mining fields of the basin. Also, it is analysed the ground surface subsidence phenomenon using the CESAR-LCPC finite element code. The modelling is made in the ela...

(Stef92 Technology, 2011-06-20, Ilie Onica)
The cooper ore reserves of Ro Еџia Poieni deposit (Romania) represents about 40% of the national cooper ore, that importance increasing with the actual rising cooper price on the international market. Deposit mineralization is located within the Fundoaia andesitic ore body and appears mainly on a system of fractures, or as uneven distribution impregnations in andesitic rocks. The mini ng of this cooper deposit began in 1977 and in 1985 reaching about 9 million tonnes of or e capacity and in 1988, 15 million tonnes...

(Stef92 Technology, 2011-06-20, Ilie Onica)
In the Jiu Valley coal basin (Romania), fr om over 2 thousand million tonnes of balance reserve, more than 60% are involved in the bituminous coal seams no.3 and no.5, which ensure 90% of the coal output of the entire basin. The thick coal seams no.3 is mined in slices with longwall mining system and roof control by caving. Because of the short mining panels, often under 300-400m, the star ting costs of mining panels become very important at the entire panel coal reserves. Th erefore, in this paper there are prese...