
Publication
SOIL STABILITY ASSESSMENT UPON PROJECTING A NEW METRO LINE IN MOSCOW
(STEF92 Technology, 2019-06-20, Irina Kozliakova)
Show more
Kozhukhovskaya metro line is under construction in the southeast of Moscow now. The geological cross-section at the construction site shows Carboniferous limestone at a depth of 30-65 m, overlain by Jurassic and Quaternary clay, loam, sand and sandy loam. The principle geohazards originate from the presence of the thick horizon of water-saturated sandy and sandy-loamy deposits. These deposits serve as an enclosing medium for the future metro tunnel. The deposits along the route were typified according to their res...
Hydrogeology, Engineering Geology and Geotechnics2019
