
Publication
MODELING THE IMPACT OF SUBWAY CONSTRUCTION ON DRUZHBA LAKE, SOFIA, BULGARIA
(STEF92 Technology, 2020-09-20, Stefan Dimovski, Nikolay Stoyanov)
Show more
A serious challenge for the construction of Sofia Metro is the shallow groundwater and the high water abundance of the hydrogeological units that are crossed by the construction route. The dewatering of the excavations for the facilities that are supported on deep foundations and the tunnels is most often associated with large and long-lasting local depressions of the water table. The joint action of the drainage systems around the metro stations and tunnel sections built simultaneously or in overlapping time inte...
Hydrogeology, Engineering Geology and Geotechnics2020
