
Publication
OCCUPATIONAL RISK ASSESSMENT USING THE RISK SCORE METHOD DURING GEODETIC MEASUREMENTS
(STEF92 Technology, 2018-06-20, Paweł Wysocki)
Show more
The article presents risk assessment during the surveyor's work. Threats occurring during geodetic measurements in the field were determined. These are various types of measurements carried out for investment purposes, topographic and property boundaries survey, determination of displacements and deformations of structures and engineering structures, etc. It is worth, therefore, that each surveyor should be aware of the dangers that may threaten him during work. Hazards related to geodetic measurements have been i...
Geodesy and Mine Surveying2018
