
JUSTIFICATION OF PARAMETERS OF BUILDING INCLINED TRENCHES USING BELT CONVEYORS
(STEF92 Technology, 2017-06-20, Anatoly Dryzhenko, Alexander Shustov, Serik Moldabayev)
Show more
Schemes of mining and construction operations have been developed for inclined trenches on the open pit edge, where transport platforms and safety benches using the drilling and blasting method of rock mass preparation are located. The volume of mining operations is calculated taking into account the dislocation of a part of the open pit edge of the deep open pit mine for placement of loading points at the bottom of inclined workings. A new scheme of conducting mining operations implementing steeply inclined conve...
