
Publication
TRANSFORMATION OF A FIXED WEIR INTO A HYDRO-POWER FACILITY
(STEF92 Technology, 2017-11-20, Krzysztof Nalepa, Wojciech Miaskowski, Maciej Neugebauer, Wieslaw Komar, Pawel Bzdera)
Show more
A technical design with an economic and energy analysis of transforming an existing water weir built in 1920 to create point-of-use water for the technological needs of a local sugar factory. Since the closure of the sugar factory, the weir has only served to stabilize the river bed. Conceptual discussions were carried out and a technical solution was proposed to convert the regulatory weir into an energy facility. Because of the small catchment area of 175.5 km2, the energy potential of this facility is low - wit...
Ecology and Environmental Protection2017
