SWS Academic Research eLibraryEarth & Planetary Sciences

Browse

Search Results

Now showing 1 - 3 of 3

Author publications

M.

3 linked publication records

Author: M.clear all
Showing 1-3 of 3 records
1
9th International Multidisciplinary Scientific GeoConference SGEM2009
Publication

GEODETIC WORKS DURING CONSTRUCTION OF THE TUNNEL "PECINE"

(SGEM Scientific GeoConference, 2009, K. Babic, A. Marendic, R. Paar)

Show more

The “Pecine” Tunnel is located on the Croatian national road D404 which connects the centre of city Rijeka and Su\vsak port with the Rijeka Bypass. Because of many specificities, namely, three-lane and four-lane sections, two connections, tunnel’s location near the residential area and railway, it was required special approach to its construction. In this paper geodetic procedure and the results of stake out supervising of some tunnel elements, cross profile surveying, as well as verification and adjustment ...

Geodesy and Mine Surveying2009
8th International Scientific Conference - SGEM2008
Publication

USING COMBINED GPS AND LASER TEHNIQUES FOR HEIGHT DETERMINATION

(SGEM Scientific GeoConference, 2008, R. Paar, A. Marendic, K. Babic, J. Vladanovic)

Show more

GPS RTK method has never achieved millimetre vertical accuracy. For the most common geodetic tasks such as surveying, staking out and monitoring, GPS RTK method in many cases has been limited by its measuring accuracy. Before the appearance of the new Topcon Lazer ZoneTM technology, we were able to achieve centimetre vertical accuracy (from 1 to 3 centimetre) using GPS RTK systems. Combining Topcon Lazer ZoneTM technology and Topcon GPS RTK HiPer Pro system accuracy of height determination can be increased to a mi...

Geodesy and Mine Surveying2008
8th International Scientific Conference - SGEM2008
Publication

VERTICAL ACCURACY OF THE BREAKTHROUGH OF THE TUNNEL

(SGEM Scientific GeoConference, 2008, Z. Kapovic, G. Novakovic, A. Marendic, R. Paar)

Show more

Tunnels are the objects of road infrastructure which construction requires very complex, demanding, and responsible geodetic tasks. In the tunnelling, at first it is necessary to establish high quality geodetic control that serves as the base for the transfer of the planned tunnel axis in horizontal and vertical directions, as well as the base for all geodetic measurements realised before, during and after tunnel construction. The basic quantity for the planning the completely measuring concept in the tunnelling i...

Geodesy and Mine Surveying2008
Showing 1-3 of 3 records
1