
Publication
ASSESSMENT OF POWER GENERATION LOSSES FOR GOLESTI HYDROPOWER PLANT, ROMANIA, DUE TO A RESERVOIR MANAGEMENT PLAN REQUIRED BY EUTROPHICATION
(STEF92 Technology, 2017-06-20, Liana Ioana Vuta, Bogdan Popa, Gabriela Elena Dumitran, Assist. Drd. Eliza-Isabela, Florica Popa)
Show more
This paper presents an assessment of power generation losses of a hydropower plant (HPP) due to an imposed reservoir management plan and comparisons in terms of monetary value with the existing management plan but with an eutrophic reservoir. The study case is represented by Gole?ti reservoir, which is a shallow reservoir in Romania, and the associated HPP. Gole?ti reservoir is an artificial lake of medium size, which has a 55пїЅ106 m3 volume and a maximum depth of 32 m. Its use is complex: it allows flood control...
Ecology and Environmental Protection2017
