
A PRACTICAL SHORT-TERM PRODUCTION SCHEDULING MODEL FOR OPEN PIT MINES
(SGEM Scientific GeoConference, 2008, J. Gholamnejad, A. Y. Bafghi)
Show more
Short-term production scheduling determines the sequence of block extraction over time spans of shift, days, weeks or months. The aim of scheduling is to decide which blocks of ore and waste to mine in which time period so that several operational and geometrical constraints can be satisfied simultaneously- like mining and mill capacity, meeting grade requirements, making long-term mine plans operationally feasible, etc. Since the 1960s several operational research based approaches have been developed. In order to...
