Scholarly record
17th International Multidisciplinary Scientific GeoConference SGEM 2017, Science and Technologies in Geology, Exploration and Mining, Vol. 17, Book 1, Volume 3
Publication details
Title
17th International Multidisciplinary Scientific GeoConference SGEM 2017, Science and Technologies in Geology, Exploration and Mining, Vol. 17, Book 1, Volume 3
Authors
Proceedings
International Multidisciplinary Scientific GeoConference SGEM 2017
Publisher
STEF92 Technology
Year
2017
Pages
Not available yet
ISSN
1314-2704
ISBN
Not available yet
Language
en
Publication type
Proceedings Volume
Keywords
Papers in this volume125
- 3D MAGNETIC INVERSION WITH SPARSENESS CONSTRAINTS BASED ON RESIDUAL NODE SUSCEPTIBILITY DOI: 10.5593/sgem2017/13/s03.001
- 3D MODELING METHODS IN PLANNING OF TECHNOLOGICAL PROCESSES IN QUARRY DOI: 10.5593/sgem2017/13/s03.002
- ABOUT THE VARIATION OF META-SILTSTONE DEFORMATION-STRENGTH PROPERTIES UNDER THE DIFFERENT SCALES DOI: 10.5593/sgem2017/13/s03.003
- ADVERSE SUBSIDENCE IN MINING AREAS - RECLAMATION OPTIONS DOI: 10.5593/sgem2017/13/s03.004
- ALGORITHM AND SOFTWARE DEVELOPMENT FOR OPTIMAL MANAGEMENT OF METHANE DRAINAGE SYSTEM AT LUPENI COLLIERY DOI: 10.5593/sgem2017/13/s03.005
- AN IMPROVEMENT ON THE IMPACT RESISTANCE TESTS FOR EXPLOSION-PROOF ELECTRICAL EQUIPMENT DOI: 10.5593/sgem2017/13/s03.006
- AN INNOVATIVE SYSTEM TO TEST COMPONENTS OF MINING MACHINERY CONTROL HYDRAULICS DOI: 10.5593/sgem2017/13/s03.007
- ANALYSIS OF CORE FAILURES DISTRIBUTION IN STEEL CORD BELTS ON THE CROSS-SECTION DOI: 10.5593/sgem2017/13/s03.125
- ANALYSIS OF DEGRADED POST-MINING AREAS FOR RE-DEVELOPMENT - CASE STUDY DOI: 10.5593/sgem2017/13/s03.008
- ANALYSIS OF IMPACT OF OHS TRAINING QUALITY ON KNOWLEDGE OF WORKERS IN MINING COMPANIES IN THE FIELD OF OCCUPATIONAL SAFETY DOI: 10.5593/sgem2017/13/s03.009
- ANALYSIS OF INFLUENCE OF THE AIR CONDITIONING ON THE AIR PARAMETERS IN UNDERGROUND MINE WORKINGS DOI: 10.5593/sgem2017/13/s03.010
- ANALYSIS OF ORGANIZATIONAL CULTURE AND IMPACT OF DECISION RESULTS ON THE EFFICIENCY OF LARGE ENERGY ENTERPRISES DOI: 10.5593/sgem2017/13/s03.011
- ANALYSIS OF STRESS STATE IN SLOPE WALL TO EXPLOITATION IN CETATE QUARRY - ROSIA MONTANA DOI: 10.5593/sgem2017/13/s03.012
- APPLICATION OF CHOSEN ELEMENTS FROM JAPANESE PRODUCTION AND MAINTENANCE MANAGEMENT PHILOSOPHIES IN POLISH COAL MINES DOI: 10.5593/sgem2017/13/s03.013
- BASIC CHARACTERISTICS OF FANS USED IN UNDERGROUND SPACES DOI: 10.5593/sgem2017/13/s03.014
- BLASTING PARAMETERS ALTERNATE SELECTION AS A TOOL FOR ELASTIC WAVE EFFECT AMPLIFICATION AT POTENTIALLY INSTABLE LOCATIONS WITHIN MAIN ROOF STRATA DOI: 10.5593/sgem2017/13/s03.015
- CLASSIFICATION AND ASSESSMENT OF ABANDONED MINING WASTE FACILITIES IN THE CZECH REPUBLIC DOI: 10.5593/sgem2017/13/s03.016
- COMPARISON OF PUNCTURE RESISTANCE TEST RESULTS FOR DIFFERENT CONVEYOR BELT DESIGNS DOI: 10.5593/sgem2017/13/s03.017
- CONSIDERATIONS ON THE IGNITION SENSITIVITY OF EXPLOSIVE FIREDAMP MINES ATMOSPHERES DOI: 10.5593/sgem2017/13/s03.018
- CONSTRUCTIVE IMPROVEMENTS OF CABLE TENSIONING MECHANISM FOR DEC DEVICES DOI: 10.5593/sgem2017/13/s03.019
- CONTINUOUS TRANSPORTATION SYSTEM MODELLING IN ONE OF UNDERGROUND MINES FOR THE PURPOSE OF ORE FLOW SIMULATION DOI: 10.5593/sgem2017/13/s03.020
- CONTRIBUTION TO THE ISSUES OF THE MINE GAS METHANE OUTPUT IN THE OSTRAVA-KARVINA COALFIELD DOI: 10.5593/sgem2017/13/s03.021
- CORRELATION BETWEEN THE LENGTH OF WAITING TIME AFTER GROUP BLASTING AND ROCK-BURST PREVENTION EFFECTIVENESS-CASE STUDY FROM A POLISH COPPER MINE DOI: 10.5593/sgem2017/13/s03.022
- COST MANAGEMENT OF MINING PROJECT LIFE CYCLE DOI: 10.5593/sgem2017/13/s03.023
- DEGRADATION OF THE STATE OF A BALL TRACK AT THE ZP 6600 DOI: 10.5593/sgem2017/13/s03.024
- DESIGN AND TEST RESULT OF THE NEW SOLUTION HYDRAULIC ROOF SUPPORT FOR LOW SEAMS DOI: 10.5593/sgem2017/13/s03.025
- DESIGN CHANGE FUNCTION OF ROTARY TABLE OF A MACHINE TOOL DOI: 10.5593/sgem2017/13/s03.026
- DESIGN OF A FEEDING STATION IN ECOLOGICAL TRANSPORTATION SYSTEM OF RAW MATERIALS DOI: 10.5593/sgem2017/13/s03.027
- DESIGN OF AN ACTUATOR AND A CRANE CRAB FRAME FOR A DOUBLE-GIRDER CRANE IN THE MINING COMPANY DOI: 10.5593/sgem2017/13/s03.028
- DESIGN OF TECHNOLOGY FOR MACHINING OF THIN-WALLED RACK OF HOUSE FOR CARRIER PIPE CONVEYOR DRIVE ROLLER. DOI: 10.5593/sgem2017/13/s03.029
- DEVELOPMENT AND VALIDATION OF A NEW CONSTRUCTION OF IMITATOR OF MINE INSULATING SELF-RESCUER DOI: 10.5593/sgem2017/13/s03.030
- DEVELOPMENT OF A MODEL OF FIRE PROPAGATION FOR THE IMPLEMENTATION IN ADAPTIVE TRAINING SIMULATORS DOI: 10.5593/sgem2017/13/s03.031
- DEVELOPMENT OF AN EXPRESS-METHOD TO CONTROL DAMAGES IN UNDERGROUND MINING EXCAVATIONS UNDER ROCKBURST HAZARDOUS CONDITIONS DOI: 10.5593/sgem2017/13/s03.032
- DIAGNOSTIC PARAMETERS EXTRACTION FOR TECHNICAL CONDITION ASSESSMENT OF SPLICES IN STEEL CORD CONVEYOR BELTS DOI: 10.5593/sgem2017/13/s03.033
- DIRECTIONAL HYDRAULIC FRACTURING BASED ON TENSILE LOADING DOI: 10.5593/sgem2017/13/s03.034
- DYNAMIC AND DURABILITY TESTS OF DRILLING RIG FOR NARROW VEIN DEPOSITS DOI: 10.5593/sgem2017/13/s03.035
- ECONOMIC ANALYSIS OF STEEL CORD CONVEYOR BELTS REPLACEMENT STRATEGY IN ORDER TO UNDERTAKE PROFITABLE REFURBISHMENT OF WORN OUT BELTS DOI: 10.5593/sgem2017/13/s03.036
- EFFECTIVENESS OF GASEOUS CONTAMINANTS REMOVAL IN A REACTIVE DEPOSIT IN THE EVENT OF EMERGENCY DURING AN UCG EXPERIMENT DOI: 10.5593/sgem2017/13/s03.037
- EFFICIENCY OF DUST SUPPRESSION IN OPERATION OF OPEN PIT MINES DURING WINTER PERIOD DOI: 10.5593/sgem2017/13/s03.038
- EFFICIENT APPLICATION OF STRIPPING SCHEMES FOR MINERAL DEPOSITS: CONVENTIONAL AND ADVANCED TRANSPORTATION OF ORE IN DEPENDENCE OF ANNUAL PRODUCTIVE CAPACITY OF UNDERGROUND MINES DOI: 10.5593/sgem2017/13/s03.039
- ENGINEERING-GEOLOGICAL AND GEOECOLOGICAL SUBSTANTIATION OF MINING SAFETY AT A UNIQUE DEPOSIT OF HIGH-GRADE IRON ORES (KURSK MAGNETIC ANOMALY, RUSSIA) DOI: 10.5593/sgem2017/13/s03.040
- EVALUATION OF MINE SUPPORT STRESS STATE ON BASE OF CONVERGENCE MEASUREMENT DATA DOI: 10.5593/sgem2017/13/s03.041
- FIRST ROMANIAN COMPUTATIONAL SIMULATION OF AIR-METHANE MIXTURE EXPLOSION DOI: 10.5593/sgem2017/13/s03.043
- FORECAST TRENDS AND NEW POSSIBILITIES OF USING SOME OF SELECTED EARTH RESOURCES DOI: 10.5593/sgem2017/13/s03.044
- FUNCTIONAL ANALYSIS OF INDUSTRIAL VENTILATION INSTALLATIONS DOI: 10.5593/sgem2017/13/s03.045
- GENERATING KNOWLEDGE ABOUT THE DOWNTIME OF THE MACHINES IN THE EXAMPLE OF MINING ENTERPRISE DOI: 10.5593/sgem2017/13/s03.046
- GEOMECHANICAL ASPECTS OF LARGE-SCALE MINING AT THE KHIBINY CONTIGUOUS APATITE DEPOSITS DOI: 10.5593/sgem2017/13/s03.047
- GEOTHERMAL CONVERSION OF ORGANIC MATTER IN THE CARBONACEOUS MEDIUM OF THE PRESENCE OF HOMOGENEUS OXIDATION CATALYSTS DOI: 10.5593/sgem2017/13/s03.048
- IDENTIFICATION OF HYDROTHERMAL ALTERATION ZONES IN GRANITIC AREAS USING MAGNETIC SUSCEPTIBILITY. AN EXAMPLE IN NW PORTUGAL DOI: 10.5593/sgem2017/13/s03.049
- IDENTIFICATION OF LOADING PARAMETERS FOR BELT CONVEYORS OPERATING IN KGHM-S MINES DOI: 10.5593/sgem2017/13/s03.050
- IMPACT OF THE PACE AND ADVANCE OF EXPLOITATION ON THE SEISMIC HAZARD- CASE STUDY FROM A POLISH COPPER MINE DOI: 10.5593/sgem2017/13/s03.051
- IMPLEMENTATION OF INNOVATIVE PROJECT FOR MONITORING AND RECORDING OF DISTRIBUTION OF EXPLOSIVE MATERIALS IN BITUMINOUS COAL MINE DOI: 10.5593/sgem2017/13/s03.052
- IMPROVEMENT OF A MINING TECHNOLOGY FOR NEAR OPEN-PIT RESERVES EXCAVATION IN THE NORTHERN CONDITIONS DOI: 10.5593/sgem2017/13/s03.053
- IMPROVEMENT OF PROJECT DECISIONS EFFICIENCY AND COST OPTIMIZATION AT THE MINE ENGINEERING STAGE OF RECLAMATION IN THE CONTEXT OF OPEN PIT ORE MINING DOI: 10.5593/sgem2017/13/s03.054
- IMPROVEMENT OF THE WORK SAFETY MANAGEMENT SYSTEM IN HARD COAL MINING WITH SPECIAL REFERENCE TO THE PROBLEM OF WORKERS PARTICIPATION DOI: 10.5593/sgem2017/13/s03.055
- INFLUENCE OF AUXILIARY VENTILATION DEVICES ON A DISTRIBUTION OF METHANE CONCENTRATION AT THE CROSSING OF LONGWALL AND VENTILATION ROADWAY DOI: 10.5593/sgem2017/13/s03.056
- INFLUENCE OF PHYSICAL-MECHANICAL AND TECHNOLOGICAL CHARACTERISTICS OF COAL AND OVERBURDEN ROCKS ON THE EXCAVATION PROCESS DOI: 10.5593/sgem2017/13/s03.057
- INTEGRATED ISSUES OF MINERAL DEPOSIT DEVELOPMENT FOR THE BENEFIT OF THE RUSSIAN ARCTIC ZONE PROGRESS DOI: 10.5593/sgem2017/13/s03.058
- INTEGRATED RESEARCH INTO FEATURES OF PHYSICAL FIELDS IN MODEL GEOMEDIUM WITH DISCONTINUITY GENERATED UNDER EXTERNAL STRESSES DOI: 10.5593/sgem2017/13/s03.059
- JUSTIFICATION OF PARAMETERS OF BUILDING INCLINED TRENCHES USING BELT CONVEYORS DOI: 10.5593/sgem2017/13/s03.060
- LABORATORY STAND TESTS OF MINING ASYMMETRICAL DISC TOOLS DOI: 10.5593/sgem2017/13/s03.062
- LABORATORY TESTS OF CONVEYOR BELT PARAMETERS AFFECTING ITS LIFETIME DOI: 10.5593/sgem2017/13/s03.063
- LOCAL AREA EDGE MONITORING OF THE NYURBINSKY OPEN-PIT MINE DOI: 10.5593/sgem2017/13/s03.064
- LOW AND HIGH SULPHIDATION EPITHERMAL GOLD DEPOSITS IN SARDINIA, ITALY DOI: 10.5593/sgem2017/13/s03.065
- MANAGEMENT RESERVES OF MINING OPERATIONS MODE IN OPEN PIT MINING OF STEEPLY DIPPING MINERAL OCCURENCES DOI: 10.5593/sgem2017/13/s03.066
- MATHEMATICAL MODELS OF POWERED ROOF SUPPORT INTERACTION WITH SURROUNDING ROCKS DOI: 10.5593/sgem2017/13/s03.067
- MATHEMATICAL MODELS USED TO DETERMINE THE STRAIN OF EXPERIMENTAL WORKS JIU VALLEY MINING BASIN DOI: 10.5593/sgem2017/13/s03.068
- METHOD OF AUTOMATED DETECTION OF SEISMICALLY ACTIVE ZONES WITHIN THE MINE FIELD BY THE DATA OF INDUCED SEISMICITY DOI: 10.5593/sgem2017/13/s03.069
- METHODICAL APPROACHES FOR FEASIBILITY STUDY OF POTENTIAL DEVELOPMENT OF ARCTIC MINERAL DEPOSITS DOI: 10.5593/sgem2017/13/s03.070
- MODERNIZATION OF ESRC - 1400 EXCAVATOR BUCKETS WITH THE HELP OF CAD/CAE SOFTWARE DOI: 10.5593/sgem2017/13/s03.071
- MONITORING SYSTEM OF ROCKBOLTING INTERACTION IN ROCK MASS CONDUCT UNDER SEISMIC ACTIVITY IN UNDEGROUND MINES DOI: 10.5593/sgem2017/13/s03.072
- NEW SOLUTIONS OF MINING TOOLS FOR HARD ROCK MINING DOI: 10.5593/sgem2017/13/s03.073
- NEW TRENDS TO OPTIMIZE THE OPERATING PARAMETERS OF VERTICAL TRANSPORT INSTALLATIONS DOI: 10.5593/sgem2017/13/s03.074
- NUMERICAL CALCULATION ASSESSMENT OF THE PARAMETERS OF ANCHORED SUPPORTS USED FOR THE CONSOLIDATION OR ROCKS SURROUNDING UNDERGROUND EXCAVATIONS DOI: 10.5593/sgem2017/13/s03.042
- NUMERICAL MODELLING OF BLIND EXCAVATION VENTILATION TAKING INTO ACCOUNT A FAILURE ZONE DOI: 10.5593/sgem2017/13/s03.075
- OPEN PIT MINING TECHNOLOGY OF STEEPLY DIPPING MINERAL OCCURENCES BY STEEPLY INCLINED SUBLAYERS DOI: 10.5593/sgem2017/13/s03.076
- OPTIMIZATION OF GEOMETRIC AND STRENGTH PARAMETERS OF TEETH FOR BUCKET WHEEL EXCAVATOR IN VIEW TO INCREASING THE CUTTING EFFICIENCY DOI: 10.5593/sgem2017/13/s03.077
- OPTIMIZATION OF THE ROD EYE FOR A TILTING PLATFORM DOI: 10.5593/sgem2017/13/s03.078
- OPTIMIZING OF COSTS AND REVENUES ON STONE AND COAL QUARRIES DOI: 10.5593/sgem2017/13/s03.079
- OPTIMIZING RELATIONSHIPS BETWEEN COSTS AND REVENUES ON QUARRIES IN THE CZECH REPUBLIC DOI: 10.5593/sgem2017/13/s03.080
- OVERVIEW OF THE UNWANTED EFFECTS OF UNMINEABLE ROCK FORMATIONS ON THE MINING SYSTEM OF BUCKET WHEEL EXCAVATOR DURING THE EXCAVATION PROCESS DOI: 10.5593/sgem2017/13/s03.081
- PARTIAL REPLACEMENTS OF CONBEYOR BELT LOOP ANALYSIS WITH REGARD TO ITS RELIABILITY DOI: 10.5593/sgem2017/13/s03.082
- PARTICULARITIES OF DESTRUCTION OF OUT-CONTOUR ROCK MASS ASSOCIATED WITH BLASTING THE SYSTEM OF BOREHOLE CHARGES DOI: 10.5593/sgem2017/13/s03.083
- POSSIBILITY FOR APPLICATION OF COMBINED METHODS OF MINING IN COAL MINES OF SERBIA DOI: 10.5593/sgem2017/13/s03.084
- PROBLEMS OF CULVERTS ON MINING SUBSIDENCE AREAS DOI: 10.5593/sgem2017/13/s03.085
- PRODUCTION OF CHEMICAL EMISSIONS OF BLACK-COAL MINE AND THEIR INFLUENCE ON THE PUBLIC HEALTH IN THE CONDITIONS OF THE OSTRAVA INDUSTRIAL REGION DOI: 10.5593/sgem2017/13/s03.086
- PROSPECTIVE SOLVING OF A VENTILATION NETWORK USING 3D CANVENT SOFTWARE DOI: 10.5593/sgem2017/13/s03.087
- PROVISION OF POSSIBILITY OF CONSTRUCTING CONVEYOR HOIST IN A STATIONARY POSITION DURING DEVELOPEMNT OF A WORKING ZONE ON STEEP PIT EDGES OF AN OPEN-PIT MINE DOI: 10.5593/sgem2017/13/s03.088
- PSYCHOLOGICAL TRAINING MODEL FOR INTERVENTION AND RESCUE PERSONNEL DOI: 10.5593/sgem2017/13/s03.089
- RADIOLOGICAL IMPACT ASSESSMENT OF URANIUM MINE DEPOSIT DOI: 10.5593/sgem2017/13/s03.090
- RECLAMATION IN THE ERVENICE AREA WITH THE USE OF SECONDARY ENERGY PRODUCTS DOI: 10.5593/sgem2017/13/s03.091
- RECOVERY AND RECYCLING OF CRITICAL METALS - A STRATEGIC PRIORITY FOR EUROPEAN UNION DOI: 10.5593/sgem2017/13/s03.092
- REDEVELOPMENT AND SUBSEQUENT RECLAMATION OF TRACHYANDEZIT (LATIT) MINE (TEPHRITE) IN BRANANY LOCATION DOI: 10.5593/sgem2017/13/s03.093
- RELIABILITY ANALYSIS OF THE BRAKE PADS OF THE WHEELED FRONT END LOADING AND TRANSPORTATION MACHINERY USED IN MINING DOI: 10.5593/sgem2017/13/s03.094
- RESEARCH ON THE DEVELOPMENT OF METHODS FOR DETERMINING THE SURFACE TEMPERATURES OF NON-ELECTRICAL EQUIPMENT AIMING PREVENTION AND PROTECTION TO EXPLOSION DOI: 10.5593/sgem2017/13/s03.095
- RESEARCHES IN THE PHASE OF EXPLOITATION OF THE ORE BODY CUKAR 2 EAST IN FUNCTION OF INCREASING LIFETIME OF THE BUCHIM COPPER MINE, EASTERN MACEDONIA DOI: 10.5593/sgem2017/13/s03.096
- RESULTS OF LONG TERM TESTING OF GEOLOGICAL SITUATION AND EXCAVATOR SCHRS 1550-4X30/K109 PARAMETERS DURING THE RELOCATION TO THE POSITION WITH THE WORSE MINING CONDITIONS IN THE LIBOUS MINE (THE MOST BASIN) DOI: 10.5593/sgem2017/13/s03.097
- REVEAL OF INTERRELATIONSHIP BETWEEN STRESS STATE AND SEISMIC ACTIVITY IN THE TECTONIC STRESSED ROCK MASS DOI: 10.5593/sgem2017/13/s03.098
- ROLE AND RELEVANCE OF AN ELECTRO CONTROL SYSTEM FOR THE OPERATION OF A POWERED ROOF SUPPORT DOI: 10.5593/sgem2017/13/s03.099
- ROPECON - PROGRESSIVE TRANSPORTATION SYSTEM FOR CONTINUOUS RAW MATERIALS TRASPORTATION DOI: 10.5593/sgem2017/13/s03.100
- ROTARY PERCUSSIVE DRILLING WITH SUBMERSIBLE DRILLING HAMMERS AND OTHER METHODS OF DRILLING WORK IN QUARRY OPERATIONS DOI: 10.5593/sgem2017/13/s03.101
- SIMULATION INVESTIGATIONS OF ROADHEADER DYNAMICS FOR AUTOMATIC CONTROL OF CUTTING PROCESS DOI: 10.5593/sgem2017/13/s03.102
- STRUCTURAL DETAILS AND OPERATIONAL AND CALCULATION PARTICULARITIES OF HYDRAULIC POWER SYSTEMS FOR THE ROOF SUPPORTS DOI: 10.5593/sgem2017/13/s03.103
- STUDY OF THE DEPENDENCE BETWEEN THE CUTTING DIRECTION RELATIVE TO STRATIFICATION AND THE DIGGING CHARACTERISTICS OF LIGNITE IN OLTENIA COAL BASIN (ROMANIA) DOI: 10.5593/sgem2017/13/s03.104
- STUDY ON WORKERS` EXPOSURE TO INHALABLE WOOD DUSTS IN MINING INDUSTRY DOI: 10.5593/sgem2017/13/s03.105
- TALC-BEARING ROCKS OF KARELIA, THEIR PROPERTIES AND POSSIBLE APPLICATION (EXEMPLIFIED BY THE KALLIEVO-MURENNANVAARA DEPOSIT) DOI: 10.5593/sgem2017/13/s03.061
- TECHNICAL SOLUTION FOR THE MINING DRILLING EQUIPMENT COMMAND SYSTEM DOI: 10.5593/sgem2017/13/s03.106
- TESTS CARRIED OUT ON CABLE ENTRIES AND THEIR IMPORTANCE WITHIN THE CERTIFICATION PROCESS OF EXPLOSION-PROOF EQUIPMENT DOI: 10.5593/sgem2017/13/s03.107
- THE CONDITIONS OF APPLICATION OF FLY ASH FROM BIOMASS IN THE AGRICULTURAL, FORESTRY AND RECLAMATION ACTIVITIES IN THE CZECH REPUBLIC DOI: 10.5593/sgem2017/13/s03.108
- THE CONFORMITY OF DELAYED IGNITION MEANS AS KEY FACTOR ON A SAFE BLASTING IN QUARRIES DOI: 10.5593/sgem2017/13/s03.109
- THE CORELATION BETWEEN PHYSICAL-MECHANICAL PROPERTIES AND THE CUTTING CHARACTERISTICS IN THE CASE OF UNMINEABLE ROCK FORMATIONS FROM HUSNICIOARA LIGNITE OPEN PIT DOI: 10.5593/sgem2017/13/s03.110
- THE COST-EFFECTIVE AND GEOTECHNIC SAFELY BUILDINGS ON THE AREAS WITH MINE EXPLOITATION DOI: 10.5593/sgem2017/13/s03.111
- THE INCREASE OF ENERGETIC EFFICIENCY OF SCREW COMPRESSORS USED FOR THE PRODUCTION OF COMPRESSED AIR INSIDE A COAL MINE DOI: 10.5593/sgem2017/13/s03.112
- THE METHOD OF DETECTING MOVEMENTS OF THE MACHINE TOOL FOUNDATIONS DOI: 10.5593/sgem2017/13/s03.113
- THE METHOD OF MINIMIZING THE CALCULATED POWER OF VERTICAL TRANSPORT INSTALLATIONS DOI: 10.5593/sgem2017/13/s03.114
- THE PERSPECTIVE OF THE USE OF MINERAL FUELS MINED IN SLOVAKIA DOI: 10.5593/sgem2017/13/s03.115
- THE POSSIBILITY OF BATTERY DRIVE APPLICATION IN MINING DRILLING RIGS DOI: 10.5593/sgem2017/13/s03.116
- THE PROPOSAL OF THE TEST EQUIPMENT FOR ANALYSIS OF THE COVERING LAYERS OF THE CONVEYOR BELT DOI: 10.5593/sgem2017/13/s03.117
- THE ROLE OF COAL PIT EXPLOITATION FROM THE JIU VALLEY ON THE REGION`S SUSTAINABLE FUTURE DOI: 10.5593/sgem2017/13/s03.118
- THE STUDY OF THE INTERACTION MECHANISM IN THE ROCK - SUPPORT SYSTEM CONSIDERING THE DEFORMATION BEHAVIOUR OF ROCKS SURROUNDING UNDERGROUND EXCAVATIONS DOI: 10.5593/sgem2017/13/s03.119
- THE TECHNOLOGY OF THE PLASMA CUTTING ON A CNC MACHINE DOI: 10.5593/sgem2017/13/s03.120
- USING THE FBG TECHNOLOGY FOR SAFETY AND OPERATION ISSUES OF UNDERGROUND MINING MACHINERY DOI: 10.5593/sgem2017/13/s03.121
- VALORIZATION OF COAL MINING WASTE DUMPS ON THE BASE OF GLIWICE CITY (SOUTHERN POLAND) DOI: 10.5593/sgem2017/13/s03.122
- VARIANTS OF IDENTIFICATION OF THE RUN-OF-MINE ORE COMPOUND WITH THE HELP OF PROCESS ANALYTIC TECHNOLOGY IN THE KGHM UNDERGROUND COPPER MINES DOI: 10.5593/sgem2017/13/s03.123
- VERIFICATION OF FORECASTS OF SUBSIDENCES, INCLINATIONS AND CURVATURES OF AREA CAUSED BY MULTIDEPOSIT MINING CONDUCTED BY INCLUDING MINING MARGIN - CASE ANALYSIS DOI: 10.5593/sgem2017/13/s03.124
View or Download full volumeAccess options
Proceedings volume accessChoose SWS login, librarian support, or direct proceedings volume purchase.
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorApproved SWS contributors can access linked proceedings materials after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Proceedings Volume
Direct volume purchaseSGEM Publishing
- Buy access to the selected proceedings volume through the SWS Library purchase workflow.
- Volume access is matched to this repository record after confirmation.
- Table of contents remains publicly available when imported.
